2008年7月20日
 
用户名:
密码:
 
新闻快递 | 原创文档 | 咨询培训 | 专家顾问 | 个人专栏 | CSDP | 产业报告 | 上海SPIN | 读编往来
English
首页 | 企业信息化 | 技术新热点 | 成才乐园New! | 软件工程 | 信息安全 | IT教育 | 软件出口 | 网站论坛


 论软件人才的职业化建设
 专家谈职业认证
 CSDP程序的发展背景
 CSDP程序简介
 认证的好处,谁应当被认证
 考试开发
 认证资格要求
 申请过程
 准备学习,参考书推荐
 CSDP考试说明,考试样题
 预备指导课程
 在线课程
 CSDP注册教育培训机构
 有关考试信息
 考试之后,证书的诠释
 软件工程职业道德规范和职业实践标准

IEEE CSDP认证-国际软件工程职业化人才的象征
 CSDP程序简介-考试说明,考试样题

CSDP考试说明

http://www.computer.org/certification/Specifications.htm

I. Business Practices and Engineering Economics
II. Software Requirements
III. Software Design
IV. Software Construction
V. Software Testing
VI. Software Maintenance
VII. Software Configuration Management
VIII. Software Engineering Management
IX. Software Engineering Process
X. Software Engineering Tools and Methods
XI. Software Quality

I. Business Practices and Engineering Economics (3-4% questions)

A. Engineering Economics
B. Ethics
C. Professional Practice
D. Standards

II. Software Requirements (13-15% questions)

A. Requirements Engineering Process
B. Requirements Elicitation
C. Requirements Analysis
D. Software Requirements Specification
E. Requirements Validation
F. Requirements Management

III. Software Design (22-24% questions)

A. Software Design Concepts
B. Software Architecture
C. Software Design Quality Analysis and Evaluation
D. Software Design Notations and Documentation
E. Software Design Strategies and Methods
F. Human Factors in Software Design
G. Software and System Safety

IV. Software Construction (10-12% questions)

A. Construction planning
B. Code design
C. Data design and management
D. Error processing
E. Source code organization
F. Code documentation
G. Construction QA
H. System integration and deployment
I. Code tuning
J. Construction tools

V. Software Testing (15-17% questions)

A. Types of Tests
B. Test Levels
C. Testing Strategies
D. Test Design
E. Test Coverage of Code
F. Test Coverage of Specifications
G. Test Execution
H. Test Documentation
I. Test Management

VI. Software Maintenance (3-5% questions)

A. Software Maintainability
B. Software Maintenance Process 
C. Software Maintenance Measurement
D. Software Maintenance Planning
E. Software Maintenance Management
F. Software Maintenance Documentation

VII. Software Configuration Management (3-4% questions)

A. Management of SCM Process
B. Software Configuration Identification
C. Software Configuration Control
D. Software Configuration Status Accounting
E. Software Configuration Auditing
F. Software Release Management and Delivery

VIII. Software Engineering Management (10-12% questions)

A. Measurement 
B. Organizational Management and Coordination
C. Initiation and Scope Definition
D. Planning
E. Software Acquisition
F. Enactment
G. Risk Management
H. Review and Evaluation
I. Project Close Out
J. Post-closure Activities

IX. Software Engineering Process (2-4% questions)

A. Process Infrastructure
B. Process Measurement
C. Process Definition
D. Qualitative Process Analysis
E. Process Implementation and Change

X. Software Engineering Tools and Methods (2-4% questions)

A. Management Tools and Methods
B. Development Tools and Methods
C. Maintenance Tools and Methods
D. Support Tools and Methods

XI. Software Quality (6-8% questions)

A. Software Quality Concepts
B. Planning for SQA and V&V
C. Methods for SQA and V&V
D. Measurement Applied to SQA and V&V

 

Sample Questions考试样题

http://www.computer.org/certification/csdpprep/Sampleques.htm

1.  Software configuration management involves identifying the configuration of the software:

[a] prior to the beginning of the lifecycle.
[b] at the beginning of the lifecycle only.
[c] at predefined  points of time during the lifecycle.
[d] at the end of the lifecycle only.


2.  Which of the following is not required of a software component?

[a] A unit of independent deployment
[b] Exploits commonalities in large software systems
[c] A unit of third-party composition
[d] Exposes source code for modification


3.  In Modern Structured Analysis, the 揺vent list?is used to:

[a] improve requirements traceability.
[b] build an Entity-Life History diagram.
[c] document the data transactions in the Entity-Relationship Diagram.
[d] build a preliminary Data Flow Diagram for the system.


4.   An engineer is developing a web presentation layer for a mission critical project. The technology chosen for the presentation layer is making it difficult to implement the user interface design. The engineer reads about a new technology for creating the type of web interface the project needs. It is decided that a rapid prototype will be created to perform an initial evaluation of the new technology.

Which of the following criteria is the LEAST important when doing the prototype?


[a] Exercising the entire breadth of functionality
[b] Simulating the operational environment
[c] Exercising critical functionality
[d] Stepping through source with a debugger


5.  Cleanroom Software Engineering techniques:

[a] emphasize defect prevention rather than defect removal.
[b] minimize formal verification practices.
[c] do not require a well-defined software development process.
[d] require that each member of the development team has a unique responsibility.


6.  A technical lead is working on an iterative lifecycle project that is creating a well understood application using a technology the team has experience with. The project has 10 major use cases to implement; two have just been delivered on schedule in the first iteration. At the request of the project manager, who is concerned about the amount of effort being spent fixing defects, the lead has collected some data on quality performance during the first iteration. The data shows that planned reviews of requirements and design are not occurring. It shows that 22 defects are being detected during unit and system testing per 100 SLOC.

The lead is asked to predict the defect trend for the project going forward. They calculate that with no changes in process the defect rate:


[a] will likely drop later in the project as kinks are worked out.
[b] will remain the same.
[c] will likely increase as the project progresses .
[d] cannot be predicted at this point.


7.  During a software development project two similar requirements defects were detected. One was detected in the requirements phase, and the other during the implementation phase. Which of the following statements is mostly likely to be true?

[a] The most expensivedefect to correct is the one detected during the requirements phase.
[b] The most expensive defect to correct is the one detected during the implementation phase.
[c] The cost of fixing either defect will usually be similar.
[d] There is no relationship between the phase in which a defect is discovered and its repair cost. .


8.  An engineer is tasked to verify a software release for a mission critical system. The plan is for the release of software for verification to occur on a Monday, with verification complete the following Friday. The release turns out not to be available until Thursday. The best route for the engineer is to:

[a] verify release criteria regardless of time line.
[b] do whatever testing they can by Friday.
[c] volunteer to work the weekend.
[d] relax release criteria .


9.  The IEEE-CS/ACM Software Engineering Code of Ethics and Professional Practice allows you to accept a position for which you have no pertinent training or experience if:

I.    The extent of your limitations are fully disclosed.
II.    Appropriate training in the pertinent area is taken concurrently.
III.    The position is in a field where engineering decisions are well known.
IV.    No conflict of interest is present.

[a] I only
[b] I and II only
[c] I, II, and III only
[d] I, II, III, and IV


10.  Which of the following do NOT affect the accuracy of the reliability estimate during statistical testing?

I.    The validity of the usage profile.
II.    The number of test cases executed.
III.    The programming language used to implement the code.
IV.    The cyclomatic complexity of the code.

[a] I and II only.
[b] II and III only.
[c] III and IV only.
[d] I and III only.

11.  Two different implementations of an abstract class (or interface) have been created.  If members of the software engineering team are to be able to correctly select the appropriate implementation to use, then the documentation for each of these implementations must include:

[a] a list of functions available and data used.
[b] the source code for the implementation.
[c] information about the side effects and resource usage for each function.
[d] name of the authors of each implementation and change history.


12.  A new engineer has been assigned to a project team. The current project is 1 month into construction, and another 6 months of construction are expected. The engineer discovers that the only design document is an overview of the logical architecture. There are over 70 source code files, most over 600 lines long, residing in a single folder.

It is very difficult to follow the module design of the system, but there appears to be functionality redundantly coded among the files shared between files. The best steps for improvement would be to:

I.  Combine files together to reduce the number of files
II.  Rework files to group functionality together
III.  Use folders to group related files together
IV.  Change programming languages


[a] I and II
[b] I and III
[c] II and III
[d] II and IV


13.  In Structured Design, why are afferent and efferent flows identified when performing Transform Analysis?

[a] The flows represent data internal to the system.
[b] The flows are limited by the physical constraints of the devices.
[c] The system design should be independent of the format of the data.
[d] The system performance depends mainly on the time of the flows.


14.  Which of the following is NOT a force that acts to encourage the generation of reference architectures?

[a] Future developers need to understand how to program future applications in a domain.
[b] A user community wants to interchange components and to inter-operate among systems.
[c] Potential customers need a principled basis for comparison among systems.
[d] The key aspects of an application domain remain invariant over time.


15.  Paul has drafted a software project management plan. Which of the following items should be discussed in this plan?

I.     Schedule
II.      Budget
III.     Requirements
IV.    Staffing

[a] I, III, IV only
[b] I, II, III only
[c] I, II, IV only
[d] I, II, III, IV


16.  Jo is developing a web presentation layer for a mission critical project with a challenging schedule. The project manager, who does not have a technical background, is always pressing for ways to reduce schedule risk. The project is following a staged delivery lifecycle. Requirements and architecture are completed, along with the first stage that delivered the initial database. Vertical slices of functionality are now being developed incrementally. The technology chosen for the presentation layer is making it difficult to implement the user interface design. Jo has just read about a new technology for generating the specified user interface.

Adopting a new technology at this stage of a project introduces the following risks:

I.  increased integration effort and time
II.  decreased usability
III.  increased testing effort and time
IV.  lower system performance
V.  lower system reliability

[a] I and III only
[b] I, II, and III only
[c] I, III, IV, and V only
[d] I,II, III, IV, and V


17.  Software metrics should be evaluated for their utility in certain areas of application.  Which one of the following areas of application should NOT be considered when evaluating the utility of software metrics?

[a] Determining product complexity.
[b] Determining productivity of individual staff members.
[c] Determining when a desired state of quality has been achieved.
[d] Determining the validity of project processes.


18.  Quality assurance may be applied to:

I.    Requirements
II.   Design
III.  Code
IV.  Testing


[a] I and II only
[b] I, II, and III only
[c] I, II, III, and IV
[d] IV only


19.  Equivalence partitioning is:

[a] a modular programming technique where the application domain is sub-divided into similarly sized functional areas

[b] a black box testing technique that divides the input domain of a program into classes of data from which test cases can be derived

[c] an object oriented design technique for improving program structure by replacing inheritance with delegation

[d] a software project management technique for distributing test responsibility within a project


20.  A project manager is assigned to a new client who needs a web interface and database for online ordering.  After assessing the scope of work, the manager decides that three GUI designers would be sufficient, and that they work at the client's site. The manager assigns the work to the first three people listed on the available staff sheet, knowing that each of them has less than two months experience at the company, but also knowing that company policy is to hire only personnel who have graduated from an accredited university with a BS degrees in a computing science.


The list below shows four ethical principles taken from the Software Engineering Code of Ethics and Professional Practice.  Which principles might the manager have violated?

I.  Ensure good management for any project on which they work, including effective procedures for promotion of quality and reduction of risk.

II.  Assign work only after taking into account appropriate contributions of education and experience tempered with a desire to further that education and experience.

III.  Not unjustly prevent someone from taking a position for which that person is suitably qualified.

IV.  Ensure that software engineers are informed of standards before being held to them.

[a] I, II and III only
[b] I and II only
[c] I, II, III and IV
[d] II and III only


21.  Early development on a new product development project proceeded smoothly.  Each member of the team was given responsibility for their own component of the final system, and they developed their code independently.  Integration was the first time that different code modules were brought together, but clear specifications enabled this phase to complete quickly.

Now that testing is underway the team is thrashing: lots of work seems to be going on, but very little progress is being made.  In particular, bug fixes often introduce new bugs, so the total bug count just keeps increasing.

What steps should be taken to improve the team's performance?

I.    Implement version control
II.    Establish a baseline for all the code
III.    Require that all changes to a module only be performed by the module's original author
IV.    Perform a configuration audit for each proposed change
V.    Send configuration status reports to all team members.


[a] II and III
[b] I and III
[c] I, II and IV
[d] I, II, and V



22. You are a requirements engineer working on a project to develop a new racing game.  Your organization has experience in developing educational games, but this genre is new.  In order to gain market share in the gaming market your organization needs to deliver a next generation product.  Several features are planned, which require hardware that is itself under development.  You have access to the hardware, which introduces some risk.  Thankfully, the development schedule is much longer than that of typical game development projects.  In order to maximize user satisfaction, your organization can pay local high school students to play the game while it is in development.

The company is re-examining the lifecycle development model to be used for this product.  Which of the following life cycle models will enable you to leverage user feedback during the development of the game?

I.    Waterfall
II.   Spiral
III.  Evolutionary
IV.   Code-and-Fix


[a] III and IV
[b] II and III
[c] I and IV
[d] II and IV


23.  A design team is working on the design of a payroll system.  The system is being revised to accommodate new features that the customer desires.  Previous versions of the design were not well documented, and the team is taking advantage of the current version to document the new design.

Analysis of the previous design noted that functions were grouped into modules in a haphazard way.  This design property is BEST described as:


[a] Coincidental cohesion

[b] Logical cohesion

[c] Content coupling

[d] Common coupling


24. The most important aspect of an abstract data type is:

[a] Knowledge about the implementation of an abstract data
type can be used for memory optimization.
[b] All signatures are encapsulated within the abstract data
type's interfaces.
[c] The separation of the implementation of the abstract date
type from its use.
[d] The polymorphism that results from defining a data structure
as an abstract data type.


25.  A design team is working on the design of a payroll system.  The system is being revised to accommodate new features that the customer desires.  Previous versions of the design were not well documented, and the team is taking advantage of the current version to document the new design.


During product implementation, a mixture of experienced and inexperienced developers were assigned to the project.  An orientation process is not in place that creates a consistent process where expectations were clearly defined.  During coding inspection, the lead developer told the developers that were new to the organization that their code was difficult to follow and understand.  Inspecting their work would need to be rescheduled so that improvements to their code could be made.  Which is the MOST effective way to improve the understandability of their code?


[a] The developers need to improve the naming of variables and functions.

[b] The developers need to follow well-known industry coding standard in their work.

[c] The developers need to follow company coding standards in their work.

[d] The developers need to explain their work to their teammates so that they can better understand it.

 

 

 

 


 友情链接: ACM || CiteSeer || CMU SEI || Construx || Cutter || IEEE-CS || itmWEB
上海市信息委 || 上海市经委 || 上海市软件行业协会 || 上海构件库
TechTarget || 珞珈远望 || 浦华瑞信 || 北京SPIN || CCW聚焦华东 || 软件出口网 更多 
最近更新日 2005.06.28
建议使用IE5.0以上版本(800*600以上) 小字体 浏览
© 2000-2005 软件出口和信息技术传播中心 制作维护: ASTI Shanghai 沪ICP备05025271号
保留所有权益